391.619 items | 3.217 manufacturer | 417 user online | 15:33 [CET]
DELIVERY COUNTRY
0 Item/s 0 EUR
Second putting into operation EIB KNX (on site)
Source photo:
EIBMARKT
(fig. might be different or similar)

Second putting into operation EIB KNX (on site)

Manufacturer: EIBMARKT
Similar top items: Show now & compare
Delivery time:
8-9 days [DE] Items to be procured that can be ordered (no central warehouse item) - live request to the central warehouse directly in the cart or click the link below the price >Quantity available?<
pce

We always deliver the latest available article version.

Note:
The installation of electrical devices may only be carried out by an approved electrician and, in the case of high-voltage systems (> = 400V and country-specific nominal power), only with the consent of the respective electricity network operator.

Details

bought
Useful
Interesting

Second putting into operation EIB / KNX (on site), valid for the current shopping basket!

Second putting into operation EIB KNX (on site)

After having delivered all EIB KNX devices to you or your electrician, the devices have to be integrated into your facility. After completion by your electrician, which means for example that all EIB KNX – controlled/regulated devices (lamps, blinds etc.) are connected and ready for operation, the system will be put into operation on site. All functions will be tested and approved of together with you. It is recommended to run the whole system for several weeks before we come to put the system into operation. This will enable you to find out whether you require any smaller modifications which could then be made by us during putting into operation and fine adjustment.


CLOSE